Abstract

This paper addresses the automatic generation contr ol of deregulated multi area power system including one of the most important renewable energy resource viz. wind power plant. Th e interconnected two area power system is thermal-h ydro system with two GENCOs in thermal area and one GENCO in hydro area. Generation rate constraint (GRC) is considered in all the GENCOs separately. Integral square error technique is used to optimize the gains of various integral controll ers. It is seen that system response becomes poorer in terms of peak overshoots and sett ling time by considering GRC. DISCO participation m atrix is chosen on the basis of open market strategy which is continuously chang ing. So, effect of changing DPM on dynamic response s is studied, following a step load perturbation. It is revealed that there is no effect of changing DPM on system’s dynamic response s.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.