Abstract

To investigate the effect of sludge retention time (SRT) and the concentration of mixed liquid volatile suspended solids (MLVSS) on oxygen transfer in activated sludge, we studied mass transfer coefficients (k(L)a) in a pilot-scale membrane bioreactor, which treated synthetic greywater. Additionally, experiments with iron hydroxide flocs were performed to examine the role of free water content in oxygen transfer. The results demonstrate that the alpha-factor is reduced when free water content decreases and floc volume increases. Because the MLVSS concentration in activated sludge mainly regulates floc volume, a reduction of oxygen transfer with increasing MLVSS concentration was observed. If the floc volume remains unchanged, oxygen transfer increases with increasing SRT.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.