Abstract

<p>As to combine with specific engineering practice, this paper presents a framework to guide rail type adhesive lifting scaffolding in high-rise residential building design and constructions well as changed the traditional characteristics of steel pipe scaffold by using new standard truss and scaffold board design All the connecting parts are connected by bolt, using electric wrench to install, and implementing the overall tools, systematic design and installation. Engineering practice proved that the frame rail type adhesive lifting scaffold can not only speed up the construction progress, control costs and improve economic efficiency, but also be popularized in similar engineering.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.