Abstract

The large ATLAS superconducting magnets system consists of the Barrel, two End-Caps Toroids and the Central Solenoid. The eight separate coils making the Barrel Toroid (BT) have been individually tested with success in a dedicated surface test facility in 2004 and 2005 and afterwards assembled in the underground cavern of the ATLAS experiment. In order to fulfill all the cryogenic scenarios foreseen for these magnets with a cold mass of 370 tons, two separate helium refrigerators and a complex helium distribution system have been used. This paper describes the results of the first cool-down, steady-state operation at 4.5 K and quench recovery of the BT in its final configuration.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.