Abstract

Through researching gravity wall rockfill dam structure’s mechanical characteristics in construction and operating process, this paper adopts finite element method to carry out simulation analysis for gravity wall rockfill dam of Gaozhai reservoir. Deducing distribution laws of the dam’s stress and displacement in construction and operating process. Analysis results show that, gravity wall rockfill dam construction of Gaozhai reservoir is reasonable, it meets the requirements for design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.