Abstract

Mining stage design which is a complex problem in terms of three-dimensional geometry that is always changing, then in this thesis the pit limit, mine sequence design or mining stages are in accordance with the tolerance stripping ratio recommended by the company and the production equipment to be used in order to obtain production targets the optimal. The research was conducted using software to design the final pit and block model method to calculate the volume. The results of the research that have been carried out obtained 752,930 MT of mined reserves and Over Burden (OB) volumes of 4,439,394 BCM and Stripping Ratio (SR).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.