Abstract

Deep-geothermal energy is a renewable energy source which provides a constant heat flux to the earth surface. If this heat is used properly, the geothermal power plant might serve as a base-load plant. However, geothermal well drilling costs are high, so the economic feasibility is not always secured. This is especially the case for low brine temperatures, which are common in NW Europe. In this paper, we will investigate the feasibility of a low-temperature geothermal plant for multiple economic scenarios. Whereas, in the literature, the focus is often on the influence of heat source conditions and environmental parameters, we focus on the economic parameter assumptions (electricity price, discount rate, lifetime, availability factor and well drilling costs). The design of the heat exchangers and the air-cooled condenser are optimized together with the operating conditions based on a thermo-economic optimization algorithm. The net present value (NPV) is the objective function. We find that the same geothermal project might be profitable (NPV = 11.63MEUR) or loss-making (NPV = −9.91MEUR), depending on the economic situation. Good economic conditions are an incentive to build a more expensive ORC which generates a high electrical power output, whereas in bad conditions, a cheap ORC must be chosen which produces less electricity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.