Abstract

This article investigates the effect of the size of the preliminary samples on the false signal rate (FSR) for the control chart with supplementary rules when the process parameters are unknown and the control limits have to be estimated. The conditional probability method is used to derive the analytical formulae for computing the FSR. Numerical results are presented and discussed. Suggestions are given to practitioners in designing and using the control chart with supplementary rules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.