Abstract

A 2 in. schedule 40 steel (60.3 mm diameter, 3.91 mm wall) core pipe in an evaporator overheads discharge line broke at several locations downstream from a section of the line that bridges a road. The failure occurred during pump restart. Fish mouth openings that developed along the pipe seams were initiated at lack of fusion defects in the pipe welds. Full drainage of the water from the pipe did not occur when the pump was shut down because such drainage created an upstream vacuum in the piping system. Freezing of water in the pipe (the line was not heat traced) and water hammer during pump restart each contributed to the extensive deformation and tearing observed at the breaks. The weld flaws served as crack initiation sites and the water hammer provided the overpressure that led to the fish mouth fracture. The pipe was replaced and a vacuum break was installed to eliminate the drainage problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.