Abstract

Stacker ARs 2000 presents the final link in the system for continuous overburden removal in the open pit mine “Kostolac” – Serbia. Its superstructure leans on three crawlers of the same length, width and height. During the stacker's travel from the erection site to the open pit mine, three crawler chain links fractured, presenting an indication of the problems that were to occur during exploitation. In fact, after only 1000 working hours (about three months), 30 chain links sustained fractures resulting in direct and indirect costs due to the downtime that substantially diminished the effects of the overburden removal system. The goal of the study presented in the paper was to diagnose the cause of chain link breakdown occurrence. Working stresses in the chain link are defined by applying FEM. Experimental investigations define the chemical composition, the tensile properties, the impact toughness and the macro and microhardness. Metallographic examinations are conducted additionally. Based on the results of the numerical-experimental analysis, it can be concluded that chain link breakdown is predominantly caused by (a) substantial deviation of the mechanical properties of the material with respect to those prescribed by the standard and (b) the existence of macro and microcracks in the material structure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.