Abstract

PurposeThe purpose of this study is to examine the factors influencing the transaction costs (TCs) in megaprojects to provide a basis for controlling project costs.Design/methodology/approachThis study selects six factors influencing the TCs in megaprojects from the perspective of TC theory and relational contract theory (RCT) through literature review. On the basis of crisp-set qualitative comparative analysis (QCA), this study tests combined factors influencing the TCs and the interaction between them.FindingsResults show that in megaprojects, TCs are affected by combination factors. The combination of asset specificity, uncertainty, transaction frequency and trust and the combination of asset specificity, reputation and trust will control TCs in certain situations. In the configuration leading to high project TCs, the combination of environmental and behavioral uncertainties is a necessary condition.Originality/valueThis paper fills up the research gap in the field of megaproject TCs, and researchers can focus on this field in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.