Abstract

This paper generalizes the standard economic production quantity (EPQ) model in process manufacturing industry by incorporating regular preventive maintenance (PM) activities into classic EPQ model. The PM program improves the condition of the production to an acceptable level, and avoids potential stoppages and disruptions, hence, it is a vital task in every production process. However, the standard EPQ model does not consider PM activities and then is not applicable to real-world situations. We consider manufacturer which produces a product under EPQ setting with a defective production process, in which every production cycle involves a number of sub-production cycles. Two models are proposed, based on the disposal time of defective items, to determine optimal number of sub-production cycles. In model I, the disposal of defective items is performed once per cycle at the end of each production cycle, while in model II, the disposal of defective items is performed multiple times per cycle, at the end of each sub-production cycle. The total cost functions are derived for each model separately, and then simple solution algorithms are designed. A numerical example is presented and discussed to evaluate proposed models. The results illustrate that model II is more cost effective than model I.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.