Abstract

The validity of a developed control logic for operation a fog cooling system was verified in a naturally ventilated greenhouse at durations of fog cooling system operation cycles (tf+s) of 60, 120 and 240 s, then at constant duration of fog cooling system operation (tf) of 35 s. The capabilities of the proposed control logic were evaluated from the viewpoint of changes in dry bulb (or air) temperature (Tdi) and relative humidity (RHi) inside the greenhouse. Even when the tf+s was changed, the control logic was capable of controlling the operation of the fog cooling system with appropriate tf. Short tf+s would contribute to minimize not only changes in Tdi and RHi, but also foliage wetting. At a constant tf, the control logic could lengthen duration of fog cooling system stand-by (ts) that also prevented excessive fogging when the potential evaporation of sprayed water inside the greenhouse was low. The proposed control logic can be implemented for controlling the operation of a fog cooling system not only at constant tf but also at constant ts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.