Abstract

AbstractThe necessity of equipping with an emergency water supply system in a supercritical circulating fluidized bed (CFB) boiler has long been a controversial topic in the industry. In this study, the heating surface of a 660 MW supercritical CFB boiler at the Pingshuo Power Station of China Coal Group is taken as the research object. And a boiler electricity failure experiment was accomplished at the power plant, and the variations of thermal parameters during electricity failure were obtained from power plant distributed control system. By analyzing the physical process of the heating surfaces during electricity failure, a mathematical model of heat transfer to the heating surface was established and a calculation program in Fortran language was developed. In this study, the effect of different flow rates and operating times of the supply pumps on the safety of the heating surfaces were then investigated. The numerical simulation results show that an emergency supply pump with a flow rate of 250 t/h, activated within 120 s, ensures the safety of the heating surface. The results of this study have important implications for the selection of emergency supply pumps and the determination of flow rates and pressures for supercritical CFB boilers with external beds.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.