Abstract
The final purification of two-phase olive mill wastewater (OMW-2) by ion exchange (IE) was addressed. This pollutant effluent was previously subjected to Pseudo-Fenton secondary treatment. Consequently, OMW-2 presented high concentrations of chloride, sodium, phenols and iron, which hinder its discharge. Experimental design was used to optimize the IE process. Around 88% removal efficiencies of these pollutants were achieved when initial pH, temperature and flow rate were 5.1, 26.8°C and 12.1Lh−1, respectively. Finally, 28L treated water could be accomplished in continuous mode under optimal conditions, complying with standards for reuse in the olive oil production process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.