Abstract

The final purification of two-phase olive mill wastewater (OMW-2) by ion exchange (IE) was addressed. This pollutant effluent was previously subjected to Pseudo-Fenton secondary treatment. Consequently, OMW-2 presented high concentrations of chloride, sodium, phenols and iron, which hinder its discharge. Experimental design was used to optimize the IE process. Around 88% removal efficiencies of these pollutants were achieved when initial pH, temperature and flow rate were 5.1, 26.8°C and 12.1Lh−1, respectively. Finally, 28L treated water could be accomplished in continuous mode under optimal conditions, complying with standards for reuse in the olive oil production process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.