Abstract

The objective of this study is to build a numerical model which combine with experimental design method as a probabilistic approach to overcome the uncertainty parameters of reservoir so that can be obtained more valid assessment result. A Plackett-Burmann design method was used to minimize experimental simulation run into 12 experiments by investigating six uncertainty parameters with two degrees level. This process assesses the impact of evaluated parameters affecting resources and interacting between these parameters. This methodology have been successfully estimated the maximum resources with polynomial function covering the entire range of possible values of important reservoir parameters.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.