Abstract

Water channeling is easy to occur during the process of water flooding in heterogeneous reservoirs. It leads to injected water noneffective cycling, the recovery decreasing and the development cost rising. By means of physical experiments and theoretical analysis, characteristics of water channeling are studied in different heterogeneous reservoirs. The result shows that when permeability contrast is lesser than 5.88, the development performance of reservoirs is similar to homogeneous reservoirs and water cut rises slowly after water breakthrough. If permeability contrast is higher than 5.88, the recovery curve has an inflexion, water cut rises rapidly and water channeling is easy to occur after breakthrough. Therefore, permeability contrast should be lesser than 5.88 in terms of layer series division in interlayer heterogeneous reservoirs. Measures must be taken to avoid water channeling when permeability contrast is higher than 5.88 in inner heterogeneous reservoirs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.