Abstract
Experience gained for many years at ZAO Interavtomatika with work on retrofitting control and monitoring systems of large power units is summarized. Principles based on which these systems should be retrofitted are considered together with the factors influencing the choice of retrofitting option, as well as decisions on constructing a process control system during full and partial retrofitting. Recommendations are given for the optimal scope of functions that should be incorporated in the software and hardware tools of a process control system during its retrofitting.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.