Abstract

Duplication of design teams in construction projects in the retail sector generates a constant feedback between the client’s team and the local engineering team, appearing down times associated with the validation of the deliverables by both teams. Any delay in a delivery, conditions the planned pace of work of production-validation-production . In order not to jeopardize the opening date, production times are adjusted on the fly, which motivates the search of planning tools less rigid than the traditional ones. Adjustment of deadlines involves reducing the quality of the deliverables, given the need to produce with the same resources in less time. As a result, the design deficiencies cause an increase of change orders in later phases. In this article, we propose the implementation of agile metrics to measure the speed of production of the design team and solve the identified deficiencies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.