Abstract
Currently, fugitive dust management on construction sites does not focus on prevention but rather seeks ways to control it after occurrence. In order to effectively manage fugitive dust on a construction site, it is necessary to quantify prevent fugitive dust from occurring, and take immediate measures after occurrence. Therefore, this study proposes a technique to estimate the amount of fugitive dust generated on a construction site using digital image information. Based on the results of this study, it is expected that high levels of fugitive dust on construction sites can be prevented in the future and efficient management will be possible.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Engineering & Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.