Abstract

There are several techniques for estimating cost and time for development. These are known in engineering as software metrics. LOC (lines of code), COCOMO (COnstructive COst Model), and FPA (Function Point Analysis) are examples of such techniques. Although Discrete Event Simulation Modeling (DESM) has some differences from classical development, it is possible to draw a parallel between these techniques and DESM. This article reviews some of the metrics from engineering, and, based on those, proposes a metric for estimating time for the implementation of a simulation model using one specific simulation software. The results obtained for 22 real simulation projects showed that the proposed technique can estimate the time for development with acceptable accuracy (average error of 6% and maximum absolute error of 38%) for models that have less that 200 simulation objects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.