Abstract

AbstractEarned value management (EVM) is an industry standard for monitoring the performance of ongoing projects. The performance baseline is set up in the planning phase to measure any time and cost deviations during project execution. Based on the current progress, an estimate at completion (EAC) is forecasted. Traditionally, EVM only focuses on the project schedule (SPI) and cost (CPI), and does not address other important aspects of health and safety, stakeholder satisfaction, and quality. Despite its superior formulation, EVM forecasts are still influenced by project risks and uncertainties, leading to inconsistency between EAC results obtained through standard formulae. In order to estimate better EAC, a framework is developed that incorporates various key performance indicators into the risk performance index (RPI). Using SPI, CPI, and RPI, an integrated model is developed and a number of case studies are run to validate it. The findings indicate a better EAC when compared to traditional methods. I...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.