Abstract

The mining industry is in need of a good planning so that the planned production targets can beachieved at minimum cost and revenue optimally, and can generate cash flow that will maximizerevenue each year over the life of the mine took place. Tin ore mining economic studies based onthe technical design data, so that the determination of the cost will be considered by the company.Components of the economic study of tin ore mining in terms of costing, revenue from the sale ofproducts, the calculation of cash flow, net present value, internal rate of return, payback period,sensitive analysis. Based on the results of studies on tin ore mine PT Mitra Stania Prima BlockKemingking acquired total reserves of tin ore amounted to 2.801,531 tons, by applying the method ofmining Open Pit Mining. From the economic feasibility calculations assuming the bank rate of 12%was obtained net present value of Rp 11.810.941.184.00, internal rate of return of 19.04%, and apayback period of 4.78 months for 2 years. Based on these results the project of PT Mitra StaniaPrima Block Kemingking feasible to continue.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.