Abstract

The conventional approaches to PPC are being reconsidered with respect to the shift in production goals from maximum output at minimum cost to high flexibility, quality, reduced throughput-time and high schedule observance. On the level of workshop control the implementation of a generated schedule in the shop is impeded by unavoidable disruptions. Since process planning is usually performed a long time before manufacturing, the load situation and the availability machines in the shop is not taken into account. Investigations have shown that in many small and medium-sized metal-working companies, 20 to 30% of the total load has to be redirected to other resources and that only a small amount of workshop orders actually complies with the original short-term schedule. This situation can be improved significantly by using flexible process plans that comprise manufacturing alternatives. These flexible or non-linear process plans allow to reconsider the final manufacturing route only shortly before or during the workshop scheduling process, when the actual situation in the workshop is known. On the other hand it facilitates to reschedule orders to other manufacturing resources in case of unforeseen disruptions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.