Abstract
Competitive electricity market has been of interest for more than a decade, with every electricity market presenting its own unique characteristics and features. The Electric Reliability Council of Texas (ERCOT) is one of the eight independent system operators (ISO) in North America which is currently structured as a zonal model. ERCOT is planning to introduce some changes in market design and transitioning into the nodal market operation. Originally scheduled for October 2006, implementation has been deferred to December 2010. This paper discusses some operational challenges in ERCOT, the ongoing discussions of market redesign, and the current status of the evolution of the ERCOT market.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.