Abstract
Purpose. The paper considers the issues of ensuring the stability of internal dumps consisting of soft rocks. This issue is relevant because the stability of quarry boards and dumps affects the safety of work in quarries. Methodology. When assessing the stability of slopes, the method of determining the minimum coefficient of stability, equal to the ratio of restraining forces to shear forces that arise in the slope array.
 Findings. The calculation and assessment of the stability of the slopes of the dumps are carried out on the example of Malyshevsky rutile-zircon-ilmenite deposit. The geological structure of the deposit overburden is represented by loess-like loams, red-brown clays, gray-green clays, fine-grained sands. To ensure the stability of internal dumps, the selective formation of dumps is proposed, which is presented in this paper in two ways. In the first variant, the dumping of Sarmatian gray-green clays into the lower part of the heap, which are weakly permeable and have low strength, is considered. In the second variant, a layer of Sarmatian sands is poured into the base of the dump. According to the normative value of the coefficient of stability margin, depending on the physical and mechanical properties of the rocks that make up the array, the optimal height and slope angle of the dump are determined. When assessing the stability of the slopes of the dump, the impact of groundwater and the possibility of location in the developed space of the tailings were also taken into account.
 Originality and Practical implications. Studies have shown that the most rational option is the formation of internal heaps with embedding in the base of the lower tier of the heap with a height of 40 m layer of Sarmatian sands; in the case of embedding in the lower part of the inner heaps of gray-green clays, it is advisable to form the lower tier of the heap with 2 sub-tiers up to 20 m high; the upper tier of the dump is recommended to be formed by one massif 26 m high. Besides, in the produced space of the quarry, the location of the tailings is possible in case of dumping Sarmatian sands into the base of the dump.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.