Abstract

Intelligent agents have successfully solved the train pathing problem on a small portion of railroad network [Tsen, 1995, Ph.D. Thesis, Carnegie Mellon University, USA]. As the railroad network grows, it is imperative that the agents collaborate to operate as efficiently as possible. In this paper, the authors demonstrate a collaboration protocol based on a conditional measure of agent effectiveness. Because agent effectiveness is not directly measurable, a suitable metric for agent effectiveness is introduced. Where typically agents run with uniform frequency, the collaboration protocol schedules the agents with a frequency proportional to their expected effectiveness. This protocol introduced a 10-fold improvement in the agent efficiency when tested with a simulation program on a portion of the Burlington Northern railroad.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.