Abstract

Congestion is termed as the operating condition in which there is not enough transmission capacity to implement all the desired transactions. This paper deals with the power trading in electricity market to ensure regular supply at competitive rates with multi congestion case. Bidding process of 75 Indian bus systems is analyzed. It is shown that how can congestion cost can be addressed through active & reactive power rescheduling and load curtailment with transmission line constraints. With rescheduling of generation the congestion is removed with some congestion cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.