Abstract

In view of the prominent and intractable problems of frequent high temperature alarms of the communication equipment and high energy consumption of air conditioners in Zhengzhou communication outdoor cabinets, a temperature control system with heat pipe as the main part and air conditioner as the auxiliary part is proposed in this paper. A prototype is developed and its applications are discussed. The annual field test shows the system works well, and it has a remarkable energy saving efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.