Abstract

The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-gas electron multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM collaboration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.