Abstract

In recent years, industrialised-building techniques have developed to the extent where the time required to construct the main framework and shell of a building is far exceeded by the time required to install the internal electrical services and fittings. To rectify this undesirable situation, pre-fabricated and pre-packaged complete wiring systems are marketed; they are intended to increase the productivity of the available labour force to enable it to keep pace with the increasing rate of building construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.