Abstract

Early effort estimation is important for efficiently planning the use of resources in an Information Technology (IT) project. However, limited research has been conducted on the topic of effort estimation in agile software development using artificial intelligence. This research project contributes to strengthening the use of hybrid models composed of algorithmic models and learning oriented techniques as a project-level effort estimation method in agile frameworks. Effort estimation in agile methods such as Scrum uses a story point approach that measures, using an arithmetic scale, the effort required to complete a release of the system. This project relied on labeled historical data to estimate the completion time measured in days and the total cost of a project set in Pakistani rupees (PKR). using a decision tree, random forest and AdaBoost to improve the accuracy of predictions. Models were trained using 10-fold cross-validation and the relative error was used as a comparison with literature results. The bootstrap aggregation (bagging) ensemble made of the three techniques provides the highest accuracy, and project classification also improves the estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.