Abstract

In this paper, permutation flow shops with total flowtime minimization are considered. General flowtime computing (GFC) is presented to accelerate flowtime computation. A newly generated schedule is divided into an unchanged subsequence and a changed part. GFC computes total flowtime of a schedule by inheriting temporal parameters from its parent in the unchanged part and computes only those of the changed part. Iterative methods and LR (developed by Liu J, Reeves, CR. Constructive and composite heuristic solutions to the P ∥ Σ C i scheduling problem, European Journal of Operational Research 2001; 132:439–52) are evaluated and compared as solution improvement phase and index development phase. Three composite heuristics are proposed in this paper by integrating forward pair-wise exchange-restart (FPE-R) and FPE with an effective iterative method. Computational results show that the proposed three outperform the best existing three composite heuristics in effectiveness and two of them are much faster than the existing ones.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.