Abstract
Hydraulic loading rate (HLR) is an important operational parameter for constructed wetland to purify wastewater. In this paper, it is the main objective to select the optimal parameter of HLR. During the four HLRs (i.e., 6 cm/d, 12 cm/d, 24 cm/d and 48 cm/d) operation period, six days were used as one stage. The experimental results showed that the best average removal rates of CODcr (59.7%) and NH3-N (89.4%) were at the HLR of 6 cm/d. In the meantime, the best average removal rate of total phosphorus (TP, 50.0%) was at the HLR of 24 cm/d. According to the low influent TP concentration, it is suggested that the HLR of 6 cm/d should be used in the multi-stage constructed wetland.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.