Abstract

In the prediction of time-series concentrations of herbicides in river water with diffuse-pollution hydrological models, farming schedules (the dates of herbicide application and drainage of irrigation water from rice paddies) greatly affect the runoff behavior of the herbicides. For large catchments, obtaining precise data on farming schedules is impractical, and so the model input inevitably includes substantial uncertainty. This paper evaluates the effectiveness of using the Monte-Carlo method to generate sets of estimated farming schedules to use as input to a GIS-based basin-scale runoff model to predict the concentrations of paddy-farming herbicides in river water. The effects of using the Monte-Carlo method to compensate for uncertainty in the evaluated parameters for herbicide decomposition and sorption were also evaluated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.