Synchronisation of small distributed generation, 30 kVA–2 MVA, employing salient-pole synchronous machines is normally performed within a narrow range of tolerances for voltage, frequency and phase angle. However, there are situations when the ability to synchronise with non-ideal conditions would be beneficial. Such applications include power system islanding and rapid generator start-up. The physical process and effect of out-of-phase synchronisation is investigated both through simulation and experimental tests on a salient-pole alternator. There are many factors that affect synchronisation, but particular attention is given to synchronisation angle, voltage difference and, as generators will be loaded during islanding, the load angle. The results suggest that it would be acceptable for the maximum synchronisation angle of distributed generation to exceed that of current practice. Interesting observations on the nature of out-of-phase synchronisation are made, including some specific to small salient-pole synchronous machines. Furthermore, recommendations are made for synchronisation under different system conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.