Abstract

The paper deals with economical aspects concerning the quality control of concrete. About 70% of total concrete production is connected with the structural concrete, the subject of quality control and/or conformity. When checking the conformity criteria for a compressive strength of concrete for a small number of samples, qualification errors do not affect the formation of costs associated with losses on external deficiencies. In order to avoid costs related to qualification errors and losses on external deficiencies, the number of samples should be set larger than the minimum (included in contract’s clauses). Furthermore, the designer recommendations should be indicated in the specification. In the paper the costs concerning quality control for concrete have been analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.