Abstract

Given a fixed sequence of unreliable inspection operations with known costs and inspection error probabilities of two types (classifying good items as defective and vice versa), we develop a model for selecting the set of inspections that should be activated in order to minimize expected total costs (inspection and penalties). We present an efficient branch and bound algorithm for finding the optimal solution, and two variations of a greedy heuristic that can be applied jointly to provide very good solutions at a O(n2) computational complexity. The conclusions are backed by a factorial experiment that included 1440 problem instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.