Abstract

An extended economic production quantity model that copes with random demand is developed in this paper. A unique feature of the proposed study is the consideration of transient shortage during the production stage, which has not been explicitly analysed in existing literature. The considered costs include set-up cost for the batch production, inventory carrying cost during the production and depletion stages in one replenishment cycle, and shortage cost when demand cannot be satisfied from the shop floor immediately. Based on renewal reward process, a per-unit-time expected cost model is developed and analysed. Under some mild condition, it can be shown that the approximate cost function is convex. Computational experiments have demonstrated that the average reduction in total cost is significant when the proposed lot sizing policy is compared with those with deterministic demand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.