Abstract

The turnaround period of well operation is influenced by an extremely large number of factors covering the geological, physical, technical and technolog ical conditions of their operation. The higher the indicator of the turnaround period of well operation, the more efficiently the stack of wells works according to planned indicators, as well as low, first of all, operating costs for well maintenance, which accordingly affects the economic efficiency of well operation.
 In recent years, a number of oil companies have been paying close attention to the problem of increasing of the turnaround period of well operation. Measures being developed are aimed at:
 reducing the aggressiveness of the extracted products;
 improvement of the installation design of an electric centrifugal pump;
 improving the design of downhole pumping equipment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.