Abstract

The article provides an overview of the existing methods of early loading of monolithic structures. It is shown that keeping concrete up to standard strength without taking into account the stages of loading leads to a significant increase in the cost of work, especially in winter. Based on experimental studies, formulas are proposed for calculating the required strength by the moment of loading of monolithic foundations, walls, columns, ceilings. Instructions are given on the design of early loading technology. The results of full-scale tests of floors under conditions of early loading are given. The technology of tiered heat treatment of monolithic structures is described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.