Abstract

A design process can be represented as a network of design activities. A number of design projects may be undertaken simultaneously. This paper deals with the problem of scheduling design activities of multiple design projects competing for the limited available resources. The problem of determining a schedule subject to precedence and resource constraints is difficult to solve. It becomes even more complex when unforeseen changes are considered, for example, in the level of resources. Therefore, the scheduling problem is decomposed into a series of multidimensional (multiresource) knapsack problems. Due to high computational complexity of the multidimensional knapsack problem, two solution procedures are proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.