Abstract

To solve the rescheduling problem of discrete manufacturing shop with uncertain processing time, an improved ant algorithm based on the rolling horizon procedure is proposed. The dynamic scheduling strategy is based on a hybrid scrolling mechanism driven by events and cycles. Analysing disturbances in the process, we divide them into explicit and implicit disturbances. The length deviation tolerance (LDT) of processing time is designed and proposed to filter out redundant rescheduling. The dynamic scheduling algorithm, based on improved ant colony algorithms, is considered with the resource constraint of the shop, and with the use of a customized state transition rule, it helps to overcome the drawbacks of long ant path searching prone to stagnation. Using simulation, the performance of the dynamic scheduling strategy and scheduling algorithm are analysed and verified, and better rolling scheduling policy parameters are obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.