Abstract

Considering the background of vibration engineering of lining structure of subway tunnel with primary defects under moving train loading, and according to the measured information of a dynamic loading spectrum of subway in Beijing, dynamic response of the lining structure with differently primary defects caused by neighboring tunnel construction has been investigated for different cases including one-way and two-way trains in this paper. The results show that the curves of dynamic time history analysis are similar with each other for displacement and stress under different cases with differently primary defects. The peak value of displacement and stress under the case of two-way train is much larger than that under the case of one-way train, and the structure primarily depends on tensile strength of concrete in safety. Under the case of one-way train with primary defects would there be no defect by vibration loads.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.