Abstract
The Cornish-Windsor bridge is the longest covered bridge in the United States and has significant historical value. Dynamic ice breakup of the Connecticut River can threaten the bridge and cause flood damage in Windsor, Vermont. We monitored ice conditions throughout the 1985-86 winter, observed a midwinter dynamic ice breakup, conducted controlled release tests during both open water and ice cover conditions, and analyzed more than 60 years of temperature and discharge records. River regulation presents alternatives for ice mangement that would minimize water levels during breakup. In this paper we develop the basis of a method to produce a controlled ice breakup at lower stage and discharge than occur during major natural events.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.