Abstract

AbstractDue to the dynamic nature, complexity, and interactivity of production scheduling in an actual business environment, suitable combined and hybrid methods are necessary. This paper takes prefabricated concrete components as an example and develops the dynamic decision support framework based on a genetic algorithm and multiagent system (MAS) to optimize and simulate the production scheduling. First, a multiobjective genetic algorithm is integrated into the MAS for preliminary optimization and a series of near‐optimal solutions are obtained. Subsequently, considering the resource constraints and uncertainties, the MAS is used to simulate complex real‐world production environments. Considering the different types of uncertainty factors, the paper proposes the corresponding dynamic scheduling method and uses MAS to generate the optimal production schedule. Finally, a practical prefabricated construction case is used to validate the proposed model. The results show that the model can effectively address the occurrence of uncertain events and can provide dynamic decision support for production scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.