Abstract
The use of wind turbines is increasing in very high rates in many countries around the world. Studies to evaluate the impact of connecting these new generation units to the existing power systems must be done and the alternative transients program - ATP, one of the most used simulation tools for power systems transient analysis, does not contain wind generation systems in its libraries. In this paper, three types of variable speed wind generation system models are developed using ATP. The model include the representation of the wind, the turbine mechanical parts, the generator, the static converter, the control systems and the power system. Simulation results of connecting a 10 MW wind farm to a real power system are presented
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.