Abstract
ABSTRACTWe report the observations of the clear‐sky fraction at the Concordia station during winter 2006 and derive from it the duty cycle for the astronomical observations. The duty cycle and observation duration at Dome C allow for efficient asteroseismic observations. This performance is analyzed and compared to network observations. For network observations, simulations were run using the helioseismic Global Oscillation Network Group as a reference. Observations with one site in Antarctica provide performance similar to or better than that with a six‐site network, since the duty cycle limited by meteorology is as high as 92%. On bright targets, a 100 day long time series with a duty cycle of about 87% can be observed, which is not possible for a network observation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Publications of the Astronomical Society of the Pacific
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.