Abstract

In this document, the variation of temperature and radiation in a 100 kW photovoltaic assembly is connected to a 25 kV network through a DC-DC booster converter and a three-phase three-phase voltage source converter (VSC). Maximum power point tracking (MPPT) is implemented in the elevator converter using a Simulink® model that uses the technique of 'Incremental Conductance + Integral Regulator'.
 The switching duty cycle is optimized by an MPPT controller that uses the technique of 'Incremental Conductance + Integral Regulator'. This MPPT system automatically modifies the duty cycle to generate the voltage required to extract the maximum power.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.