Abstract

A reassessment of the SOMBRERO laser driven fusion power plant that was designed in 1990–91 has been conducted. New information and analysis has confirmed most of the original design decisions except that the tritium inventory in the blanket may be larger than originally calculated. Possible methods of lowering the tritium inventory are described along with a discussion of the critical issues that still remain 10 years after the original design was completed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.